• Home
  • Company
    • About Brown and Caldwell
    • Company History
    • Company Management
    • Careers
  • Services
    • Membrane Support Services
    • Planning
    • Pilot Studies
    • Design Services
    • Construction Phase Services
    • 3D Scanning
  • Markets
    • Drinking Water
    • Water Reuse
    • Wastewater
  • Portfolio
  • News and Publications
    • News
    • Publications
  • Contact Us
SPISPI
  • Home
  • Company
    • About Brown and Caldwell
    • Company History
    • Company Management
    • Careers
  • Services
    • Membrane Support Services
    • Planning
    • Pilot Studies
    • Design Services
    • Construction Phase Services
    • 3D Scanning
  • Markets
    • Drinking Water
    • Water Reuse
    • Wastewater
  • Portfolio
  • News and Publications
    • News
    • Publications
  • Contact Us

SPI to design brackish RO for Fallbrook Public Utilities District (CA)

SPI to design brackish RO for Fallbrook Public Utilities District (CA)

October 28, 2014 News

After interviewing five engineering firms for its Santa Margarita Conjunctive Use Project facilities, Southern California-based Fallbrook Public Utilities District has selected a team led by Infrastructure Engineering Corporation (IEC). The IEC team includes SPI as a subconsultant.

The overall program involves the adaptive management of surface water and groundwater resources through the diversion of Santa Margarita River surface waters to groundwater percolation ponds and the active use of groundwater aquifers for water storage. This specific project involves treatment by reverse osmosis and distribution of groundwater extraction, which will vary from 0 to 8 MGD (0-30,280 m3/d) based on the previous year’s precipitation.

The project’s reverse osmosis system, which will be designed by SPI, will desalt up to one-half of the 8 MGD water supply to meet the final product water treatment objectives. Vice President Alex Wesner will manage SPI’s design effort.

Share
0

You also might be interested in

spi-engineering-logo

Management Change

Nov 28, 2018

Separation Processes, Inc. (SPI) announces the transition of Vice President,[...]

SPI awarded contract for North Pleasant Valley Desalter Project

Sep 14, 2017

Separation Processes, Inc. (SPI) has been awarded a contract as[...]

SPI acquired by Brown and Caldwell to advance its water and wastewater treatment solutions

SPI acquired by Brown and Caldwell to advance its water and wastewater treatment solutions

Jun 30, 2025

SPI acquired by Brown and Caldwell, an engineering consulting firm creating and delivering water and environmental solutions throughout North America and the Pacific

SPI ENGINEERING NEWS

  • SPI acquired by Brown and Caldwell to advance its water and wastewater treatment solutions June 30, 2025

Contact Us

We're currently offline. Send us an email and we'll get back to you, asap.

Send Message
Contact Us

Contact Info

  • Brown and Caldwell
  • 277 Rancheros Dr., Suite 370, San Marcos, CA 92069
  • (800) 727-2224
  • (760) 400-3661
  • brownandcaldwell.com

© 2025 · spi-engineering.com

  • Privacy Policy
  • Site Map
  • Contact Us
Prev Next