• Home
  • Company
    • About Brown and Caldwell
    • Company History
    • Company Management
    • Careers
  • Services
    • Membrane Support Services
    • Planning
    • Pilot Studies
    • Design Services
    • Construction Phase Services
    • 3D Scanning
  • Markets
    • Drinking Water
    • Water Reuse
    • Wastewater
  • Portfolio
  • News and Publications
    • News
    • Publications
  • Contact Us
SPISPI
  • Home
  • Company
    • About Brown and Caldwell
    • Company History
    • Company Management
    • Careers
  • Services
    • Membrane Support Services
    • Planning
    • Pilot Studies
    • Design Services
    • Construction Phase Services
    • 3D Scanning
  • Markets
    • Drinking Water
    • Water Reuse
    • Wastewater
  • Portfolio
  • News and Publications
    • News
    • Publications
  • Contact Us

Membrane Filtration Guidance Manaual

Membrane Filtration Guidance Manaual

November 30, 2013 Publications
USEPA developed The Membrane Filtration Guidance Manual in support of the Long Term 2 Enhanced Surface Water Treatment Rule (LT2ESWTR), which has identified membrane filtration (i.e., MF, UF, NF, RO, and membrane cartridge filtration (MCF)) as one category of treatment technology in a “toolbox” of options that may be used to achieve the required level of Cryptosporidium treatment. Although the LT2ESWTR only regulates membrane filtration in terms of its application for compliance with the requirements of the rule, the concepts and guidance provided in this manual may also be relevant to the Interim Enhanced Surface Water Treatment Rule (IESWTR), the Long Term 1 Enhanced Surface Water Treatment Rule (LT1ESWTR), the Ground Water Rule (GWR), and other regulations, at the discretion of the State.
Get the entire manual
Share
0

You also might be interested in

Leo Vander Lans WTF

Leo Vander Lans WTF Expansion

Sep 25, 2019

The Water Replenishment District of Southern California, (WRD) owns the[...]

SPI to design brackish RO for Fallbrook Public Utilities District (CA)

Oct 28, 2014

After interviewing five engineering firms for its Santa Margarita Conjunctive[...]

SPI Part of Winning Team for West Basin Phase V Expansion

Nov 30, 2009

SPI as part of a team was recently awarded a[...]

SPI ENGINEERING NEWS

  • SPI acquired by Brown and Caldwell to advance its water and wastewater treatment solutions June 30, 2025

Contact Us

We're currently offline. Send us an email and we'll get back to you, asap.

Send Message
Contact Us

Contact Info

  • Brown and Caldwell
  • 277 Rancheros Dr., Suite 370, San Marcos, CA 92069
  • (800) 727-2224
  • (760) 400-3661
  • brownandcaldwell.com

© 2025 · spi-engineering.com

  • Privacy Policy
  • Site Map
  • Contact Us
Prev Next