Project Description

Client
 West Basin Municipal Water District
Markets
Advanced Wastewater, Construction, Design Services, Piloting, Planning, Procurement, Training

The Phase IV Expansion of West Basin Municipal Water District’s main treatment facility provided an
WBMWD4increase in production of reclaimed water for the Seawater Barrier and replacement of the lime clarification pretreatment system with microfiltration in the original Phase I facilities.

Capacity: 11 mgd of MF, 3.5 mgd of RO

Technology: Microfiltration, Reverse Osmosis

SPI Role:
SPI was retained to oversee the pilot testing and procurement documents for the microfiltration system (including both submerged and pressurized technologies). Additionally, SPI provided the detailed design of the 3.5 mgd reverse osmosis plant expansion as well as supervision in construction and startup.