• Home
  • Company
    • About Brown and Caldwell
    • Company History
    • Company Management
    • Careers
  • Services
    • Membrane Support Services
    • Planning
    • Pilot Studies
    • Design Services
    • Construction Phase Services
    • 3D Scanning
  • Markets
    • Drinking Water
    • Water Reuse
    • Wastewater
  • Portfolio
  • News and Publications
    • News
    • Publications
  • Contact Us
SPISPI
  • Home
  • Company
    • About Brown and Caldwell
    • Company History
    • Company Management
    • Careers
  • Services
    • Membrane Support Services
    • Planning
    • Pilot Studies
    • Design Services
    • Construction Phase Services
    • 3D Scanning
  • Markets
    • Drinking Water
    • Water Reuse
    • Wastewater
  • Portfolio
  • News and Publications
    • News
    • Publications
  • Contact Us

West Basin Seawater Desalination Pilot Project

Home Drinking WaterWest Basin Seawater Desalination Pilot Project

West Basin Seawater Desalination Pilot Project

September 25, 2019 Drinking Water, Piloting, Planning

The West Basin seawater desalination pilot testing is a multi-phase testing program operating on an
WBseawaterpilotopen-intake seawater supply from a power plant cooling loop. Partially funded by the National Water Research Institute and The US Bureau of Reclamation, is generating data on the performance of microfiltration and ultrafiltration pretreatment of reverse osmosis on both the ambient temperature intake supply and warm water discharge of power plant. The study has developed operating and design parameters for the District’s current demonstration-scale project and ultimately full-scale implementation of microfiltration and reverse osmosis on this seawater source.

Capacity: 50 gpm

Technology: Microfiltration, Ultrafiltration, and Reverse Osmosis

SPI Role:
Throughout three major phases of testing, SPI defined the treatment process, prepared equipment procurement packages including a detailed design of the RO system, arranged the lease of a pilot MF & UF systems, prepared the test protocols, provided on-site process engineering support, data analysis and reporting.

Share
0

You also might be interested in

San Diego County Water Authority Camp Pendleton Desalination Project

Mar 24, 2016

The San Diego County Water Authority (SDCWA) has awarded a[...]

AWWA Journal Paper Published

Sep 24, 2018

The following paper was prepared by James Vickers, P.E., Vice-President[...]

West Basin’s Universal Membrane System – Pressurized PVDF Performance Pilot Program Particulars

Mar 30, 2016

Introduction to West Basin West Basin is a public agency[...]

SPI ENGINEERING NEWS

  • SPI acquired by Brown and Caldwell to advance its water and wastewater treatment solutions June 30, 2025

Contact Us

We're currently offline. Send us an email and we'll get back to you, asap.

Send Message
Contact Us

Contact Info

  • Brown and Caldwell
  • 277 Rancheros Dr., Suite 370, San Marcos, CA 92069
  • (800) 727-2224
  • (760) 400-3661
  • brownandcaldwell.com

© 2025 · spi-engineering.com

  • Privacy Policy
  • Site Map
  • Contact Us
Prev Next