• Home
  • Company
    • About Brown and Caldwell
    • Company History
    • Company Management
    • Careers
  • Services
    • Membrane Support Services
    • Planning
    • Pilot Studies
    • Design Services
    • Construction Phase Services
    • 3D Scanning
  • Markets
    • Drinking Water
    • Water Reuse
    • Wastewater
  • Portfolio
  • News and Publications
    • News
    • Publications
  • Contact Us
SPISPI
  • Home
  • Company
    • About Brown and Caldwell
    • Company History
    • Company Management
    • Careers
  • Services
    • Membrane Support Services
    • Planning
    • Pilot Studies
    • Design Services
    • Construction Phase Services
    • 3D Scanning
  • Markets
    • Drinking Water
    • Water Reuse
    • Wastewater
  • Portfolio
  • News and Publications
    • News
    • Publications
  • Contact Us

Evaluation of Scinor Membrane for Retrofit and Future Expansion at SPMWD

Evaluation of Scinor Membrane for Retrofit and Future Expansion at SPMWD

March 30, 2016 Publications

2016AWWAVickersSPfpageThe San Patricio Municipal Water District (SPMWD or District) has operated its Plant C facility for the production of filtered water for industrial and municipal consumers. The feed water is a blend of two sources: 1) the Nueces River and 2) Lake Texana. Water from these sources is combined at the Naismith reservoir before entering the “potable” treatment facilities at Plant A (conventional) and Plant C (membrane). The Plant C treatment system consists of coagulation, flocculation, sedimentation, and MF filtration using a Pall membrane system.

You can read the entire paper by clicking here

You can see the entire presentation by clicking here

Share
0

You also might be interested in

Comprehensive Results of West Basin Municipal Water District’s Multi-Year Ocean Water Desalination Demonstration Project

Feb 27, 2014

Authors: Diane Gatza, Frank Fuchs, Marc Serna – West Basin[...]

West Basin’s Universal Membrane System – Pressurized PVDF Performance Pilot Program Particulars

Mar 30, 2016

Introduction to West Basin West Basin is a public agency[...]

Time to Clean Again? Changes in Cleaning Frequency and Effectiveness at the Reynolds Groundwater Desalination Facility

Mar 30, 2016

Sweetwater Authority (SWA) owns and operates the Richard A. Reynolds[...]

SPI ENGINEERING NEWS

  • SPI acquired by Brown and Caldwell to advance its water and wastewater treatment solutions June 30, 2025

Contact Us

We're currently offline. Send us an email and we'll get back to you, asap.

Send Message
Contact Us

Contact Info

  • Brown and Caldwell
  • 277 Rancheros Dr., Suite 370, San Marcos, CA 92069
  • (800) 727-2224
  • (760) 400-3661
  • brownandcaldwell.com

© 2025 · spi-engineering.com

  • Privacy Policy
  • Site Map
  • Contact Us
Prev Next